Hong Kong international stadium main-bowl stone works — 29,000 ㎡ of stone across a 50,000-seat major stadium, covering tiered seating, public corridors, VIP boxes, athlete tunnel, press room, façade and outdoor plaza. Faced with 50,000 spectators in dense foot traffic, 50 years of outdoor durability, and 60+ events a year with construction during the season, HENGSHENG MARBLE S&T CO. LIMITED Stone delivered in 26 months using zoned digital workflows.

The international stadium is built around "durability and ceremony": 30 mm bush-hammered Steel Grey Granite for the 50,000-seat bowl and public areas delivers durability, Botticino warm stone for the VIP boxes and victory banquets creates ceremony, and mirror-polished Absolute Black Granite for the chairman's platform and athlete tunnel projects refinement — three principal stones balance "outdoor durability" and "indoor ceremony" across the sports architecture.
HENGSHENG MARBLE S&T CO. LIMITED Stone supplied and installed all stone for the 29,000 ㎡ main bowl: 20,000 ㎡ of tiered seating treads and risers, 5,000 ㎡ of public corridors and athlete tunnel, 3,000 ㎡ of VIP areas and boxes, 1,000 ㎡ of façade and outdoor plaza. Delivered zone by zone over 26 months while the season kept running — 60+ events a year with zero disruption.
Three principal stones cover every scenario across the 50,000-seat bowl and all indoor/outdoor areas, unifying outdoor durability, ceremony and wear resistance.



All 14 photographs are as-built records of the completed areas. Click any image to view the stone details enlarged.














Six stages from 3D scanning to zoned handover — 26 months, the season kept running.

360° laser scanning of the 50,000-seat bowl and the whole stadium produced millimetre-level point clouds, resolving 526 structural deviations and spectator interface points in advance.

20,000 ㎡ of Steel Grey bush-hammered thick slabs pre-assembled and numbered by seating zone, producing piece-by-piece installation drawings aligned with the zoned works program.

Five-axis CNC machined 20,000 ㎡ of 30 mm bush-hammered granite and 12,000 linear metres of seating caps to a tolerance of ±0.5 mm.

The seating bowl's 30 mm thick slabs travelled in steel-framed wooden crates — zero breakage throughout city delivery.

A 50-tonne mobile crane with vacuum lifters installed to the zoned program; night transport avoided event peaks.

Seating joints sealed with MS Polymer modified silane sealant, UV- and ozone-resistant, no cracking across -40 °C to 90 °C thermal cycles; 50-year design life.
Craft details up close — in a major stadium, precision hides in the millimetres and the seals.

Seating stone is fixed with M12 stainless-steel back-bolts plus three-way adjustable aluminium brackets, capacity ≥8 kN per point; one panel loosening does not affect its neighbors.

Seating treads have a 30 mm drainage channel with 12 L/min/m drainage capacity; rainwater cleared within 5 minutes during heavy rain.

Seating stone with six-sided fluorocarbon protective coating plus joint sealant; 5,000-hour accelerated weathering test shows no chalking or discoloration.

Seating treads with bush-hammered finish and rolled anti-slip grooves, anti-slip grade R11; wet-state coefficient of friction ≥0.68, meeting stadium safety standards.

Seating tread-riser joint ±0.5 mm; treads have a 30 mm anti-slip nose and a 20 mm drainage channel at the back, overall flatness ±1.5 mm over 3 m.

Curved seating sections were five-axis CNC profiled, arc-length tolerance ±2 mm; joints sealed with wet-dry separation for double protection against rainwater ingress.
50,000 spectators in dense foot traffic, 50 years of outdoor durability, and 60+ events a year with construction during the season — HENGSHENG MARBLE S&T CO. LIMITED Stone answers with data.
Each event draws 50,000 spectators in and out; ordinary stone easily chips, cracks and dulls under shoe impact and high-frequency foot traffic.
The seating bowl is 100% outdoor, exposed long-term to UV, acid rain, thermal cycling and freeze-thaw; ordinary stone chalks, discolors and cracks.
The stadium hosted 60+ events a year; works could not affect the season, and noisy trades had to fit into gaps between events.
Poor seating-bowl drainage during storms can easily cause spectator slips; ordinary 30 mm seating stone cannot satisfy both load-bearing and drainage.
Whatever the scale of your project, our engineering consultants will tailor the optimal stone solution for you — from material selection through to handover, with one-to-one service throughout.
Thank you for your enquiry. Our engineering consultant will contact you within 24 hours.
Browse more project case studies and discover HENGSHENG MARBLE S&T CO. LIMITED's excellence across every building type.